Frame Assembly R&R

Included Operations

Remove and install: Front and rear bumpers, Front sheet metal as an assembly, Hood, Body assembly, Pickup bed, Spare tire (when attached to frame), Mechanical assemblies (example: engine, transmission, suspension, fuel tank, differential and components)
Remove and install or replace: Radiator, Wiring and/or wiring harness if necessary, Exhaust system, Fluid lines, Engine mounts/absorbers, Vapor canister, Clips and bolted brackets attached to frame

Not Included Operations

Overhaul assemblies or replace parts of assemblies that are transferred
Remove and/or apply: Anti-corrosion rust resistant materials
Remove and install: Seats, Interior trim if necessary
Remove and install or replace: Welded or riveted assemblies of the frame (seeNote), Optional accessories (example: auxiliary lamps and fuel tanks, brush guard, trailer hitch, trailer connector)
Wheel alignment
Adjust control linkage
Bleed brakes if necessary
Evacuate and recharge Air Conditioning if so equipped and necessary
Refrigerant recovery if necessary
Pull back carpet as required

NOTE: Frame Assembly R&R requires planning. Proper preparation and job sequencing are key to performing this operation. Also, special equipment, additional work space and manpower may be needed.

NOTE: It may be necessary to transfer parts from the damaged frame or order new parts to use on the new frame. This cannot be determined until you see the new frame. The needed additional time for this operation must be estimated.