Quarter Outer Panel R&R

Included Operations

Remove and install: Rear seat, Parcel shelf trim, Quarter trim, Plastic wheelhouse liner, Luggage compartment trim, Rear lamp assemblies, Rear bumper, Filler panel, stone deflector, or rear lower valance
Remove and replace urethane set glass: Back window and moulding, Quarter window and moulding
Remove and install or replace: Non urethane set glass (Back window and moulding, Quarter window and moulding), Water/dust barrier, Lock striker, Sill plates, Bolt-on extension
Loosen and pull back: Cloth type headliner as required, Carpet and/or insulation as required, Weatherstrip attached to panel
Loosen convertible top at quarter
Remove caulking/seam sealer for panel R&R. Replacement of caulking/seam sealer to obtain water sealing properties of the panel seams
Replace clip type moulding for base model vehicle

Not Included Operations

Refinish quarter panel
Remove and/or apply: Anti-corrosion rust resistant materials
Remove and install: Preformed or molded type headliner, Fuel tank
Remove undamaged urethane set glass: Back window and moulding, Quarter window and moulding (See Example Below)
Remove and replace inner panels
Remove and install or replace: Wheel, Antenna
Replace sound deadening
Replace channels attached to glass; add.2 hour for lower and.3 hour for upper and lower
Remove and install adhesive exterior trim; add to clean and retape
Replace new adhesive exterior trim; deduct one-half of R&R time
Apply caulking/seam sealer for additional sound deadening and/or to replicate original factory appearance, texture or color
Install stripes, decals, transfers or overlays
Drill holes for installing exterior trim
Cut holes for installing lamps
Broken glass clean up

IMPORTANT REMINDER: Procedure Number 20 includes removal of damaged urethane set glass and replacement with new glass. The Procedure does not include allowances for necessary precautionary measures to remove undamaged urethane set glass, nor clean up of the old adhesive on the glass. If the existing urethane set glass is undamaged and will be reused, the labor time difference between the glass R&R and R&I represents the not included allowance.

Example: A Quarter Panel allowance includes a Back Glass R&R of 2.0 hr. The R&I of the back glass is 2.3 hr. The difference of .3 hr. between Back Glass R&R (2.0 hr.) and R&I (2.3 hr.) has not been factored into the Quarter Panel allowance.

IMPORTANT REMINDER: Labor times for inner panels, rails or reinforcements are with outer panels removed. No back, quarter glass (non-movable) or flush mounted reveal mouldings can be removed without the possibility of breakage or damage that will require replacement. Unintentional damage to glass that is considered a structural member by the vehicle manufacturer may occur when attempting alignment pulls to correct unibody collision damage. Agree beforehand who will incur the charge for damage occurring during normal R&R or R&I operations.

FULL PANEL REPLACEMENT PROCEDURE: Labor times are for replacement at factory seams if feasible. However, many quarter panels cannot be replaced at roof seams because the roof panel overlaps the quarter. If a quarter panel is designed in this manner and a section time is not listed, the time in the text represents replacement of the panel at the most practical area - usually below the roof seam. This method is considered a full panel replacement provided the back glass and, if applicable, the quarter glass is removed for splicing in the pillar/sail areas.