Frame Rail R&R

Included Operations

Time allowance to replace frame rails is for each rail separately
Disconnect, connect or support as necessary: Front bumper, Engine, Steering, Suspension, Cab, Sleeper, All mounts, All hydraulic lines, Electric cables

Not Included Operations

Refinish rail
Remove and install cab, box or van
Disconnect an connect refrigerant lines: add 2.0 hours
Evacuate and recharge A/C system
Refrigerant recovery
Add time for: Remove and replace hydraulic pump, P.T.O. drive supports, Air lines or air suspension devices, Bleed brakes, if necessary, Bumper, Drill installation holes, Radiator and fuel tanks