Cab Assembly R&I
Included Operations
| • | Disconnect and connect original equipment |
| • | Align cab to frame |
Not Included Operations
| • | Repairs to cab |
| • | Remove and install: Sleeper (non-integral), Fuel tank, Air tank, Air deflector, Side fairing, Cab extender |
| • | Evacuate and recharge A/C |
| • | Drill installation holes |