Engine & Transmission R&I
Included Operations
|
•
|
Disconnect an connect: Necessary wiring, hoses and cables, Fuel lines |
|
•
|
Remove and install: Hood assembly, if equipped and necessary, Hub |
|
•
|
Time needed for alignments, adjustments, inspections and tests according to manufacturer’s specifications |
Not Included Operations
|
•
|
Remove and install or replace: Any parts on engine if necessary |
|
•
|
Evacuate and recharge air conditioning if so equipped and necessary |
NOTE: Labor times shown in the text are only to remove and install the engine and/or transmission assembly in order to facilitate other work. The times are not for engine or transmission replacement.