Sleeper Panel R&R
Included Operations
|
•
|
All base items on or attached to panel being replaced |
Remove caulking/seam sealer for panel R&R. Replacement of caulking/seam sealer to obtain water sealing properties of the panel seams
|
•
|
Loosen and pull back carpet and/or insulation as required |
|
•
|
Replace clip type moulding for base model vehicle |
Not Included Operations
|
•
|
Remove and install sleeper |
|
•
|
Replace roof rails and header panels |
|
•
|
Remove and replace: Interior trim and mouldings |
|
•
|
Remove and install or replace: Headliner assembly, Vertical exhaust system, Satellite & bracket, Air deflector/fairing, Cab extender |
|
•
|
Replace new adhesive exterior trim; deduct one-half of R&R time |
|
•
|
Remove and install adhesive exterior trim; add to clean and retape |
Apply caulking/seam sealer for additional sound deadening and/or to replicate original factory appearance, texture or color
|
•
|
Install stripes, decals, transfers or overlays |
|
•
|
Drill holes for installation |