Inner Structure Assembly R&R |
|
Included Operations Remove and install: Cowl trim Remove and install or replace: Shroud and radiator assembly Impact absorbers or mounting arms if necessary to perform operation Cowl top panel if assembly includes dash panel Loosen and pull back carpet and insulation as required Remove and replace caulking for standard factory application Labor times for inner panels, rails or reinforcements are with outer panels removed. Sectioning of a panel may or may not be recommended by vehicle manufacturer. This procedure should only be performed when a qualified and knowledgeable technician has determined that the operation does not jeopardize the integrity of the vehicle.
|
Not Included Operations Refinish radiator support, apron and/or front rail Aim lamps Remove and/or apply: Anti-corrosion rust resistant materials Remove and install: Front bumper Hood panel Front fenders Engine Wiring and/or wiring harness Remove and replace: Radiator hose Fan, pulley, fan clutch or belts Decals (example: EPA, body identification, caution/danger) Remove and install or replace: Suspension assemblies Bolted parts and assemblies (example: fluid reservoirs and coolers, vapor canister, cruise control, air conditioning components) Instrument panel and center console Seat assemblies Windshield and mouldings Air safety bag Wheel alignment Frame set up (see Definitions section), estimate time required |
Mitchell Support: |
|