Frame Rail R&R

Included Operations

• Time allowance to replace frame rails is for each rail separately
• Disconnect, connect or support as necessary: Front bumper, Engine, Steering ,Suspension, Cab, All mounts, All hydraulic lines, Electric cables

Not Included Operations

• Refinish rail
• Remove and install cab, box or van
• Disconnect an connect refrigerant lines: add 2.0 hours
• Evacuate and recharge A/C system
• Refrigerant recovery
• Add time for: Remove and replace hydraulic pump, P.T.O. drive supports, Air lines or air suspension devices, Bleed brakes, if necessary, Bumper, Drill installation holes, Radiator and fuel tanks

IMPORTANT REMINDER: Due to the design of suspension on unibody vehicles, it may be necessary to perform four wheel alignment.