Sleeper Assembly R&I

Included Operations

• Remove and install sleeper
• Disconnect and connect wires and air conditioning lines
• Align sleeper to cab and frame

Not Included Operations

• Remove and install or replace: Vertical exhaust system
• Evacuate and recharge A/C
• Refrigerant recovery